Réalisation d’une extension dans le poste 220/60/30 kV de Tiaret, Algérie

Abstract : This project consists of an extension in a substation 220/60/30 kV, a transformer of 80 MVA 220/60/10 kV, a 60/30 kV transformer of 40 MVA, two 220 kV lines and three 60 kV lines. Also in this project, we have built an MV building that feeds the 24 over head lines and two capacitor banks. The whole system is occupied by a system of control and protection relays and a new digital control system which will be integrated into the existing system. This project is designed by Matelec turnkey project (study of civil, electrical, mechanical engineering, supply of equipments, executions and commissioning of the project). Keywords: substation, power transformer, line, cable, circuit breaker, disconnector switch, neutral resistance, telecommunications, CCN, dispatching, electrical protections, load shedding, capacitor batteries.
Document type :
Master Thesis
Complete list of metadatas

Cited literature [3 references]  Display  Hide  Download

https://dumas.ccsd.cnrs.fr/dumas-01473655
Contributor : Cnam - Service Commun de la Documentation - Bibliothèque Centrale <>
Submitted on : Wednesday, February 22, 2017 - 9:57:26 AM
Last modification on : Saturday, February 8, 2020 - 12:02:02 PM
Long-term archiving on: : Tuesday, May 23, 2017 - 1:09:38 PM

Identifiers

  • HAL Id : dumas-01473655, version 1

Collections

Citation

Dany Saoub. Réalisation d’une extension dans le poste 220/60/30 kV de Tiaret, Algérie. Energie électrique. 2011. ⟨dumas-01473655⟩

Share

Metrics

Record views

223

Files downloads

16819