Abstract : The 180 MW Midelt wind farm is a part of the Moroccan policy that has committed to produce 52% of its electricity production by renewable ressources. However, the operation of this wind farm can only begin after having carried out the necessary studies dealing with its operation under normal conditions and in the event of disturbances. Therefore, technical studies (calculation of cable cross-sections, load flow analysis, calculation of shortcircuit currents and adjustment of protections…) have been carried out in order to ensure the functioning of the park according to the standards that organize this type of projects which constantly present real problems when connecting to the network.
Résumé : Le parc éolien de Midelt de 180 MW entre dans le cadre de la politique marocaine qui s’est engagée à produire 52% de sa production en énergie électrique à partir de sources renouvelables. Cependant, la construction et l’exploitation de ce parc ne peuvent commencer qu’après avoir effectué les études nécessaires traitant son fonctionnement en régime normal et en cas de perturbations. À cette fin, des études techniques ; à savoir le calcul des sections des câbles, l’analyse de l’écoulement de charge, le calcul des courants de courts-circuits et le réglage des protections, ont été réalisées afin d’assurer le fonctionnement du parc suivant les normes qui organisent ce genre de projets qui ne cessent de présenter de vrais problèmes lors de raccordement au réseau.